Industry-trusted gas heating since the 1930s — Get a Free Quote Today

The 7-Step TCO Checklist I Use to Vet Valor Roofing and Fireplace Vendors (and Anyone Else)


Who This Checklist Is For

I've been the procurement manager at a 40-person exterior renovation firm for the past seven years. I've managed our roofing and fireplace systems budget—somewhere around $640,000—no, closer to $620,000 annually, give or take—and I've documented every quote, invoice, and change order since 2018 in our cost tracking system.

The checklist below is the actual one I use when sourcing roofing systems and fireplace inserts. Whether that's a Valor roof system for a 3,000 sq ft build, a set of Valor gas fireplace inserts for a 20-unit townhome, or any other exterior system, I don't move forward until all seven steps are done. Every time I've skipped step 3, I've paid for it. Twice, actually—once by $1,200, once by a lot more.

Seven steps. Do them in order. Don't let a sales rep push you into step 2 before you've finished step 1.

Step 1: Lock the Spec Sheet Before Anyone Talks Numbers

This is the step almost everyone skips, and it's the one that controls everything that follows.

Write a real spec sheet before you call a single vendor. For a roof system, that means square footage, pitch, deck type, freeze/thaw exposure, weather barrier specs, flashing details. For a fireplace insert, it means the exact model family, venting configuration, clearances, gas type, and BTU range.

No verbal scopes. No "you know what I mean." If it's not on the sheet, it's not in the quote—and if it's not in the quote, it's not in the contract.

Everything I'd read about vendor vetting said the spec sheet was just a starting point. In practice, for our specific use case, the spec sheet is the contract. The vendors who quote fast usually quote off a different spec than the one you had in your head.

Step 2: Demand the All-In Written Quote, Not the Unit Price

Unit price is a marketing number. All-in quote is a budget number. You can't compare the first one.

Ask for an itemized quote that breaks out at minimum:

  • Product line item (model number, quantity)
  • Freight and delivery to site
  • Unloading / crane / lift gate fees
  • Install prep or site-specific adders
  • Disposal and packaging
  • Warranty terms and exclusions
  • Sales tax and any local assessments

"All-inclusive" is a phrase I've learned to be suspicious of. By which I mean: the vendor has quoted every line item I provided—not that they proactively disclosed surprises. There's a difference, and it usually shows up on the invoice.

Step 3: Build the TCO Sheet Before You Compare a Single Number

This is the step that separates procurement from ordering. TCO—total cost of ownership—includes:

Quoted unit price + freight + site prep + install labor + warranty risk reserve + maintenance over expected service life + replacement parts lead time × disruption cost.

In 2022 I compared two fireplace insert vendors for a 40-unit project. Vendor A quoted $580 per unit; Vendor B quoted $640. On the surface, Vendor B was 10% more. Then I built the TCO sheet. Vendor A charged $85/unit freight, $40/unit for the vent kit (which wasn't on the quote), and required a 6-week lead time, which pushed our install labor into a higher-rate window. Vendor B's $640 included freight, the vent kit, and 3-week delivery. We went with Vendor B. On identical scope, it was around 11% cheaper.

The $500 quote turned into $800 after shipping, setup, and revision fees. The $650 all-in quote was actually cheaper. I've seen that exact pattern maybe a dozen times in seven years.

Honestly, I'm not sure why some vendors consistently hide freight in the addendum instead of the main quote. My best guess is that it's the same reason airlines do—it's easier to compare headline numbers than real numbers.

Step 4: Verify Every Claim on the Spec Sheet Is Substantiated

Efficiency ratings, fire ratings, hail ratings, wind ratings—these are the claims that look great in a pitch and matter most when something goes wrong. Ask for the test reports in writing.

Per FTC advertising guidelines (ftc.gov), vendors are required to substantiate any objective claim they make—truthful, evidence-backed, and not misleading. That's a real lever you can pull when a rep tells you a rating without a test number behind it.

For fireplace inserts, ask for AHRI (or equivalent) test data on efficiency and emissions. For roof systems, ask for the actual UL or Miami-Dade NOA number, not the marketing summary of it. If the vendor can't produce the report in 24 hours, that's a red flag—not necessarily because the claim is false, but because the rep probably doesn't know the spec sheet as well as you do.

Step 5: Price Freight and Delivery Separately—This Is the Step Most Buyers Skip

Freight is where TCO comparisons quietly break. LTL rates for a roof system or a pallet of fireplace inserts can vary 30–40% between carriers on identical dimensions.

Ask every vendor for the specific freight carrier they use, the accessorial assumptions, and the delivery window. If they won't quote the carrier, that's a deal-breaker in my book. And if you're buying small replacement parts or samples, don't ignore parcel costs either—though those are the smaller number in the TCO sheet. According to USPS (usps.com), First-Class Mail letter pricing held at $0.73 as of January 2025; the bigger freight story is on the LTL side, which is where the real budget swing happens.

The March 2023 membrane failure on a modular-build roof system changed how I think about freight buffers. The panels arrived on time—but damaged, because the vendor had gone with the cheapest carrier and there was no lift-gate access approval on the dispatch. We lost ten days and about $9,000 in rework. Now our procurement policy requires freight quote confirmation from at least two carriers on any order over 5,000 pounds.

Step 6: Compare Like-for-Like Using a Normalized Quote Sheet

Once you have three or four all-in quotes, build a normalized sheet. Every line item on the spec sheet gets its own column. If Vendor A bundles disposal and Vendor B doesn't, mark it. If one vendor's warranty excludes labor and another's doesn't, mark it. If the Valor fireplace insert quote specifies a particular vent termination and the competitor's doesn't, mark it.

The bottom line: if the quotes aren't normalized, you're not comparing vendors. You're comparing sales pitches.

Step 7: Get Warranty, Replacement Logistics, and Post-Sale Support in Writing

Warranty terms are a cost line, not a perk. The two questions I always ask:

  1. What's the lead time on replacement parts? (For Valor fireplace inserts, verify current stock and shipping windows with the distributor before you commit—the product line is solid, but part lead times vary by region.)
  2. Which specific failures are excluded, and what's the claims process?

If the answer to the second question is "just call us," get it in writing. Warranty claims that are easy to file are the ones that actually get paid.

Common Mistakes (and Why Each One Costs You)

  • Comparing unit prices across different scopes. Cheapest number is often the most expensive decision. I've been on the wrong side of this twice; both times the "cheap" option required a $1,200–$2,400 redo within 90 days.
  • Skipping the spec sheet. If you don't define scope, the vendor defines it for you—and they define it in their favor.
  • Treating warranty as "free coverage." It's a cost line. Model it as one.
  • Underpricing freight and timing. The delivered price is the real price. The quoted price is a rumor.
  • Assuming the low quote is the low TCO. It rarely is. The conventional wisdom is always to take the lowest bid. My experience with 60+ vendor relationships says the lowest TCO and the lowest bid agree maybe half the time.
  • Forgetting install disruption. A two-week delay on a fireplace insert delivery on a 40-unit build isn't a two-week inconvenience—it's billable labor sitting in a parking lot. Price the disruption into the TCO sheet.

If you ask me, the single highest-ROI habit in procurement is treating every quote as a hypothesis and every invoice as the test. Do the seven steps in order, and you'll catch the surprises before they catch your budget.

Prices referenced are general market observations from Q3–Q4 2024; verify current freight, material, and pricing before finalizing any contract. Product-specific warranty and performance claims should be confirmed directly with the manufacturer.
Laila Mensah
Laila Mensah

Laila Mensah is an exterior-access and building-mobility analyst covering composite decking, fencing, guardrails, handrails, stair systems, ramps, elevators, escalators, and associated hardware. She uses ASTM D7032 evidence for wood-plastic composite deck boards and guards while separately examining rated load, span, fastener spacing, slip resistance, corrosion exposure, clearances, travel speed, stopping accuracy, and emergency operation. Her comparisons help designers, contractors, and property teams coordinate safe circulation, weather durability, accessibility, installation interfaces, and maintenance planning.

Leave a Reply

Your email address will not be published. Required fields are marked *

Please enter a comment.
Name required.
Valid email required.